Getting the school constructed along with the mason.

in WORLD OF XPILAR5 days ago

Mobile Photograhy

1000436345.jpg

My dear friends, you all are welcome to our community. Nowadays we are very busy in the construction of the school because the construction of the school is going on at a fast pace, I hope that the school will become even better in the coming days.It has become a very difficult time to provide good education and everything at affordable prices to everyone School expenses have increased a lot these days because airy rooms and fans along with a good education are most important for the children.So we have started the construction of the building because for the first time some major changes were not made in the building Earlier the building was ventilated from both the sides of the school due to which we were hoping that it will be better in the coming days but hopefully After a few days, nothing happened, there was a jungle on the right side of the school and houses were built there. After building the houses, walls were built all around and along with that, the heat is touching the walls.
1000436347.jpg

So we thought why not make some changes in the structure of the building as a little construction can be beneficial for everyone The ones which are located on the upper side were getting very hot and it was becoming a big problem to heat them up in the summers, so I thought why not change them Then we thought that we should build a building around it and the lower roof can get a lot of relief and the upper roof will be much better and other work can also be done in it.When it rained, the problem increased a lot because there was very little space left inside the school, due to which it was difficult to conduct prayers or any other program.The advantage here is that other things can also be done along with prayer in the open Therefore, we have made many changes in the construction of the school so that after reaching the second or third floor, we can easily reach anyone and we have made it airy from all sides.Now I feel that I should discuss these things some more, but it doesn't matter, it's okay, there is no need to think too much about it.

1000436346.jpg
I have reached the top and asked the mason when the walls around it will be completed. He said that the walls around it will be completed by this evening. After constructing the wall around the school, we thought that we also need to construct the living room because this time we have to make water arrangements in such a way that there is dryness all around because some things in the school were such that there was water all around.A lot of things can be protected from rain, so we have put umbrellas all around the top so that the umbrella does not get very hot and the simple panel can do its job well, but if for some reason there is a problem with the solar panel After covering the entire roof with solar panels, it will give two benefits, the students will be protected and the electricity required for the school will also be reduced. Now our electricity bill will be reduced a lot, which can save a lot of money.
1000436348.jpg

Photos captured by@ahlawat
Camera Devicenothing
LensDefault
CategoryNature, Photography, Flowers, Animals, Birds
LocationIndia
EditedCaptured one
I hope you like this.You are all welcome.